India is endowed with large wind energy potential. The total estimated wind Energy Potential taken at the wind speed of 50m/hr. is 49130 MW & calculated at the rate of wind speed of 80m/hr. is 102788 MW.
The State-wise wind power potential as per Wind Atlas is as below:
States / UTs |
Estimated potential (MW) |
|
@ 50 m |
@ 80 m * |
|
Andaman & Nicobar |
2 |
365 |
Andhra Pradesh |
5394 |
14497 |
Arunachal Pradesh |
201 |
236 |
Assam |
53 |
112 |
Bihar |
- |
144 |
Chhattisgarh |
23 |
314 |
Dieu Daman |
- |
4 |
Gujarat |
10609 |
35071 |
Haryana |
- |
93 |
Himachal Pradesh |
20 |
64 |
Jharkhand |
- |
91 |
Jammu & Kashmir |
5311 |
5685 |
Karnataka |
8591 |
13593 |
Kerala |
790 |
837 |
Lakshadweep |
16 |
16 |
Madhya Pradesh |
920 |
2931 |
Maharashtra |
5439 |
5961 |
Manipur |
7 |
56 |
Meghalaya |
44 |
82 |
Nagaland |
3 |
16 |
Orissa |
910 |
1384 |
Pondicherry |
- |
120 |
Rajasthan |
5005 |
5050 |
Sikkim |
98 |
98 |
Tamil Nadu |
5374 |
14152 |
Uttarakhand |
161 |
534 |
Uttar Pradesh |
137 |
1260 |
West Bengal |
22 |
22 |
Total |
49130 |
102788 |
*To be validated through field measurements
The installed Capacity of Wind Energy is as below:
(a) Wind Power Total Achievement
Sl.No. |
States |
Achievement (Upto January, 2014) |
1. |
Andhra Pradesh |
648 |
2. |
Gujarat |
3384 |
3. |
Karnataka |
2312 |
4. |
Kerala |
35 |
5. |
Madhya Pradesh |
386 |
6. |
Maharashtra |
3472 |
7. |
Rajasthan |
2734 |
8. |
Tamil Nadu |
7251 |
9. |
Others |
4 |
|
Total |
20226 |
Regarding Wind Energy, under the Generation Based Incentive (GBI), Rs.0.50/Unit is provided to private developers as incentive for generation of power subject to a ceiling of Rs.1.00 crore/MW. The benefit is to be availed in more than 4 years and less than 10 years. The year-wise targets and achievement in last three years and current year are given below:
Year |
Target(MW) |
Achievement (MW) |
2010-11 |
2000 |
2350 |
2011-12 |
2400 |
3196 |
2012-13 |
2500 |
1700 |
2013-14 |
2500 |
1174(upto January, 2014) |
The wind power development is taking place with private sector investment, for which proposals are not to be submitted in the Ministry. The GBI claims of developers are settled by Indian Renewable Energy Development Agency (IREDA) and as such no proposals are received in the Ministry from States/UTs.
Regarding Wind Energy, the expenditure under GBI scheme in last three years and current year is given below:-
Year |
Expenditure (Rs. In crore) |
2010-11 |
25.00 |
2011-12 |
21.18 |
2012-13 |
44.46 |
2013-14 |
224.56 |