SJVN Issues Tender for Setting Up Solar Plant Worth 100 MW at Dholera Solar Park

The scope of work for the selected bidders will include the design, engineering, supply, procurement, construction, testing and commissioning of the solar power plant on a Build Own Operate (BOO) basis

July 07, 2020. By News Bureau

Tags:

SJVN Ltd has announced that it has issued a tender, inviting bids from qualified firms and Solar Power Developers (SPDs) for setting up of 100 MW grid-connected solar PV power plant at the Dholera Solar Park in Gujarat.

The scope of work for the selected bidders will include the design, engineering, supply, procurement, construction, testing and commissioning of the solar power plant on a Build Own Operate (BOO) basis. The time afforded to the successful EPC bidders will be 15 months from handing over of the project site to complete the work on the commissioning of the project. The developers will also be required to provide comprehensive operation and maintenance services for the plant for a period of 10 years from the date of successful commissioning.

The project capacity was won by SJVN in the tender (Phase-IX) floated in March by the Gujarat Urja Vikas Nigam Limited (GUVNL). GUVNL was re-tendering the 700 MW capacity which remained unallocated in solar tenders invited by GUVNL on January 16, 2019, (Phase V) and June 24, 2019 (Phase VII).

SJVN will arrive into a Power Purchase Agreement with GUVNL for a period of 25 years from the scheduled commercial operation date of the project. The maximum tariff payable to the selected bidder and that a bidder can quote at any stage during the bidding process was Rs 2.92 per unit.

The last date for bid submission is July 16, 2020, and the techno-commercial bids will be opened on the same date. The date and time of opening of the price bids and the e-reverse auctions will be informed by SJVN to the qualified bidders. A pre-bid meeting has been scheduled for July 8, 2020, to address the concerns raised by the prospective bidders.

All bidders are required to submit an Earnest Money Deposit (EMD) of Rs 11.8 lakh along with their bids.

As per the tender, all empanelled parties of SJVN under “Design, Engineering, Supply, Erection, Testing, Commissioning and Comprehensive O&M for Ten Years of 100 MW (AC) Solar Power Plant at Dholera Solar Park (Phase IX), Gujarat (100MW) shall be eligible to participate in this NIT. Provided that they have an Annual Average Turnover for the last three financial years not less than Rs 380 crore.

Please share! Email Buffer Digg Facebook Google LinkedIn Pinterest Reddit Twitter
If you want to cooperate with us and would like to reuse some of our content,
please contact: contact@energetica-india.net.
 
 
 
Next events

 

Last interview
 
 
Privacy Policy (PDF) / Terms and conditions (PDF)
 Energetica India is a publication from Editorial Omnimedia. No reproduction in whole or part of content posted on this website.