wind-power
Tata Power successfully commissions 44 MW Lahori wind farm project in Madhya Pradesh
Total installed capacity stands now at 9183 MW
Renewable energy wind-power | April 28, 2016 | By Moulin | 5558 readings
RNRG and Ventus install Wind Iris Lidar at first-ever Uruguayan wind farm to boost performance
To monitor turbine performance and offer optimization solutions for the project.
Renewable energy wind-power | April 20, 2016 | By Moulin | 5027 readings
Gamesa secures 40 MW repeat wind order from ReNew Power
Order entails 20 units of G97-2.0 MW T104 and will be commissioned by September 2016
Renewable energy wind-power | April 19, 2016 | By Moulin | 5459 readings
RNRG’s CMS system TurbinePhD installed at Grant County Wind Farm
To enable Suzlon to execute elements of predictive maintenance at Grant County
Renewable energy wind-power | April 13, 2016 | By Moulin | 5023 readings
Falling Wind Tariffs to Impact IRR in Wind Energy : Ind-RA
Developers may shun low wind resource locations which may otherwise have been viable with GBI or higher tariff
Renewable energy wind-power | April 05, 2016 | By Moulin | 5118 readings
Suzlon wins another order from IOCL for 48.30MW wind project
Project has the potential to provide power to 26,000 households and reduce 0.10 million tonnes of CO2
Renewable energy wind-power | March 30, 2016 | By Moulin | 5588 readings
Vaisala and Pattern Energy Strike Lightning Data Deal
The data will be used by Pattern Energy to optimize blade inspection and repair programs
Renewable energy wind-power | March 29, 2016 | By Moulin | 5047 readings
WWEA releases 2016 Small Wind World Report- "Small Wind World Market"
Reaches 830 MW, a growth rate of 10,9 %, after 10,4 % in the previous year
Renewable energy wind-power | March 17, 2016 | By Moulin | 5160 readings
Suzlon wins order of 71.40MW from Gujarat Industries Power Company Ltd.
To provide operation and maintenance service for a period of 20 years
Renewable energy wind-power | March 17, 2016 | By Moulin | 5236 readings
Suzlon wins order of 71.40 MW from Gujarat Industries Power Company Ltd.
To provide operation and maintenance service for a period of 20 years
Renewable energy wind-power | February 29, 2016 | By Moulin | 5027 readings
