wind-power
Siemens Gamesa Conditionally Bags Offshore Wind Project worth 376 MW in Taiwan
The project will be located in Miaoli County, and utilise 47 units of the SG8.0-167 DD offshore wind turbine. SGRE will also be responsible for the full servicing...
Renewable energy wind-power | June 17, 2019 | By News Bureau | 2359 readings
KSEB Inks PSA with SECI for Sourcing Wind Power worth 200 MW
Lately, SECI had announced that it has signed three PSA with Bihar DISCOMS worth 800 MW. The 3 PSAs aggregating 450 MW Solar and 350 MW Wind Power signed by...
Renewable energy wind-power | June 17, 2019 | By News Bureau | 3053 readings
Greece Unveils Europe’s Second Renewable Hybrid Power Project
The 6.9 megawatt project – alike to one located on El Hierro, the smallest of the Canary Islands – will swap part of the power now produced by an...
Renewable energy wind-power | June 08, 2019 | By News Bureau | 2446 readings
MSEDCL Releases RfS for Obtaining of 500 MW Wind Power in Maharashtra
The last date for bid submission is July 5, 2019, and the techno-commercial bids will be opened on the same date. A pre-bid meeting has been scheduled for June...
Renewable energy wind-power | June 07, 2019 | By News Bureau | 2294 readings
Siemens Gamesa Secures Order for 640 MW Offshore Wind Project in Taiwan
Situated around six kilometers from shore in the Taiwan Strait, the plant will feature 80 SG 8.0-167 DD offshore wind turbines. This first firm order in the...
Renewable energy wind-power | June 03, 2019 | By News Bureau | 2441 readings
Siemens Gamesa Secures 232 MW Order From EDF Renewables
The contract also includes a service and maintenance agreement for Siemens Gamesa’s premium maintenance program, offering the best in scale and flexibility...
Renewable energy wind-power | May 24, 2019 | By News Bureau | 2522 readings
Vestas to Provide Turbines for Fortum’s Initial Large-Scale Project in Finland
The contract includes supply, installation and commissioning of the wind turbines, as well as a long-term Active Output Management (AOM 5000) service agreement....
Renewable energy wind-power | May 22, 2019 | By News Bureau | 2229 readings
Engie and EDP Enters into JV; Aims to be Second-Largest Offshore Wind Developer
The joint venture, which for EDP will be through its EDP Renovaveis (EDPR) renewables business, aims to reach 5-7 GW of projects in operation or construction...
Renewable energy wind-power | May 22, 2019 | By News Bureau | 2401 readings
Vestas Enlists Sulzer Schmid & WKA Blade Service For Massive Drone-Based Blade Inspections
Vestas has opted for a drone-based solution, which is the only approach that can meet its high-quality standards within such a demanding time-frame
Renewable energy wind-power | May 21, 2019 | By News Bureau | 2453 readings
Vestas Secures 249 MW Order from EDF Renewables
The order comprises supply and commissioning of the turbines as well as a five-year active output management service agreement
Renewable energy wind-power | May 20, 2019 | By News Bureau | 2740 readings
