Home › Renewable energy ›OIL Green Energy Signs MoUs with Haryana Govt for 4 Integrated Waste-to-Clean-Energy Projects
OIL Green Energy Signs MoUs with Haryana Govt for 4 Integrated Waste-to-Clean-Energy Projects
Oil India subsidiary OIL Green Energy has signed MoUs with four Haryana municipalities to set up four integrated CBG and waste-to-energy projects to process a cumulative of 5,000 TPD of waste into 50 MW of green power and up to 75 TPD of compressed biogas.
August 31, 2026. By Mrinmoy Dey
OIL Green Energy (OGEL), a wholly-owned subsidiary of Maharatna CPSE Oil India (OIL), has announced that it has signed Memoranda of Understanding (MoUs) with four Municipalities of Haryana – Gurugram, Faridabad, Hisar and Ambala – for the development of integrated CBG and waste-to-energy projects across the respective clusters.
The MoUs were signed in the presence of the Chief Minister of Haryana, Nayab Singh Saini, along with senior Ministers, Members of Parliament and senior officials of the Government of Haryana and OIL/OGEL.
The four projects are proposed across the Hisar (500 TPD), Ambala (900 TPD), Faridabad (1,600 TPD) and Gurugram (2,000 TPD) clusters. Together, the facilities will have the capacity to scientifically process 5,000 tonnes of municipal solid waste per day and are expected to produce 70-75 TPD of Compressed Biogas (CBG) along with 50 MW of green power.
The projects envisage an integrated waste processing and resource-recovery approach, wherein municipal solid waste will undergo scientific pre-processing and segregation to maximise resource recovery. Recyclable material will be recovered; the wet and biodegradable fraction will be utilised for the production of CBG, while only the non-recyclable dry fraction will be utilised for the generation of electricity through Waste-to-Energy facilities.
The MoUs were signed in the presence of the Chief Minister of Haryana, Nayab Singh Saini, along with senior Ministers, Members of Parliament and senior officials of the Government of Haryana and OIL/OGEL.
The four projects are proposed across the Hisar (500 TPD), Ambala (900 TPD), Faridabad (1,600 TPD) and Gurugram (2,000 TPD) clusters. Together, the facilities will have the capacity to scientifically process 5,000 tonnes of municipal solid waste per day and are expected to produce 70-75 TPD of Compressed Biogas (CBG) along with 50 MW of green power.
The projects envisage an integrated waste processing and resource-recovery approach, wherein municipal solid waste will undergo scientific pre-processing and segregation to maximise resource recovery. Recyclable material will be recovered; the wet and biodegradable fraction will be utilised for the production of CBG, while only the non-recyclable dry fraction will be utilised for the generation of electricity through Waste-to-Energy facilities.
If you want to cooperate with us and would like to reuse some of our content,
please contact: contact@energetica-india.net.
please contact: contact@energetica-india.net.
