NTPC's Installed Capacity Touches 57000 MW
NTPC Ltd. presently operates 54 power stations (23 Coal, 7 combined cycle gas/liquid fuel, 2 Hydro, 1 Wind and 11 solar projects) and has 10 coal and 1 gas station, owned by Joint ventures or subsidiaries taking the capacity to 57,106 MW
October 04, 2019. By News Bureau
NTPC has announced that with operationalization of two units of 1320-mw, it's installed capacity has touched 57016 mw.
The capacity addition of Unit -1 of 660 MW of Stage-II of Tanda Super Thermal Power Station in Uttar Pradesh and Unit -1 of 660 MW of Khargone Super Thermal Power Station in Madhya Pradesh, the total installed capacity of NTPC and NTPC group has become 48645 MW and 57106 MW respectively, an official statement said.
Khargone Super Thermal Power is India's first ultra-supercritical plant that operates at an efficiency of 41.5%, the high efficiency will result in less coal consumption for generating same amount of electricity resulting in reduction of 3.3% Carbon dioxide emissions.
NTPC Ltd. presently operates 54 power stations (23 Coal, 7 combined cycle gas/liquid fuel, 2 Hydro, 1 Wind and 11 solar projects) and has 10 coal and 1 gas station, owned by Joint ventures or subsidiaries taking the capacity to 57,106 MW.
NTPC targets to accomplish total installed capacity of 130 GW by 2032.
please contact: contact@energetica-india.net.
