Home › Business ›L&T Wins 300 MW / 900 MWh BESS Order for Khavda Project

L&T Wins 300 MW / 900 MWh BESS Order for Khavda Project

L&T’s Renewables business and LTEPS jointly secures an order to develop a 300 MW / 900 MWh Battery Energy Storage System at Khavda, Gujarat.

November 25, 2026. By News Bureau

L&T’s Renewables business and LTEPS jointly secures an order to develop a 300 MW / 900 MWh Battery Energy Storage System at Khavda, Gujarat. 

Two L&T verticals – the Renewables business and L&T Electronic Products and Systems (LTEPS) - have jointly won an order to develop a 300 MW / 900 MWh Battery Energy Storage System (BESS) at Khavda in Gujarat.

The project will feature a three-hour BESS, with a power capacity of 300 MW and an energy storage capacity of 900 MWh. By storing surplus renewable energy during periods of high generation and releasing it during peak demand, it will help maximise clean-energy utilisation, strengthen grid stability and enhance the flexibility and reliability of power supply.

The advanced BESS solution will incorporate liquid-cooling technology to deliver higher power density, enhanced safety and a longer operating life. The facility will play a crucial role in improving grid flexibility and enabling greater integration of renewable energy into India's power network.

Please share! Email Buffer Digg Facebook Google LinkedIn Pinterest Reddit Twitter
If you want to cooperate with us and would like to reuse some of our content,
please contact: contact@energetica-india.net.
 
 
Next events
 
 
Last interviews
 
Follow us