HomeRenewable energy ›JAKEDA Invites Bids for 152.75 MW Rooftop Solar Projects in Jammu and Kashmir

JAKEDA Invites Bids for 152.75 MW Rooftop Solar Projects in Jammu and Kashmir

Jammu & Kashmir Energy Development Agency (JAKEDA) has issued a tender to develop 152.75 MW of grid-connected rooftop solar PV projects on government buildings across the Union Territory under the RESCO model. Bid submission ends on December 1, 2025.

November 01, 2025. By Mrinmoy Dey

Jammu & Kashmir Energy Development Agency (JAKEDA) has floated a tender for setting up grid-connected rooftop solar PV projects with a total cumulative capacity of about 152.75 MW on government buildings in the UT of Jammu and Kashmir under RESCO mode through tariff-based competitive bidding.

The individual size of the projects shall range from 20 kW to 500 kW.

Bidders must pay INR 25,000 as a bid document fee. Further, they need to furnish INR 5 lakh/MW as an earnest money deposit (EMD). Selected bidders must deposit INR 6 lakh/MW as a performance bank guarantee (PBG).

The last date for submission of bids is December 1, 2025. The techno-commercial bids will be opened on December 2, 2025.

The modules used in the project must have been included in the ALMM List-I for solar PV modules. Only Mono PERC Half Cut/Mono PERC Half Cut Bifacial modules or of higher efficiency technology like TOPCon would be allowed to use. Both DCR and Non-DCR modules are allowed to be used.

The bidder must have experience in design, supply, installation and commissioning of grid-connected solar PV power plants of cumulative capacity not less than 1 MW in the last seven financial years. Additionally, the solar PV power plants must be commissioned and should be operating satisfactorily for a period not less than one year.

The net worth of the bidder must be at least INR 50 lakh/MW of the quoted capacity, as on the last date of FY 2024-25. The bidder must demonstrate a minimum average annual turnover (MAAT) of INR 1 crore/MW of the quoted capacity during the last three financial years. Additionally, the bidder must possess working capital or a line of credit for FY 2024-25, for a minimum amount of INR 90 lakh/MW of the quoted capacity.
  Download the attached file
Please share! Email Buffer Digg Facebook Google LinkedIn Pinterest Reddit Twitter
If you want to cooperate with us and would like to reuse some of our content,
please contact: contact@energetica-india.net.
 
 
Next events
 
 
Last interviews
 
Follow us