Ampt Receives String Optimizers Order for 210 MW of Solar+Storage Project
Ampt announced that it has received an order for Ampt String Optimizers for 210 MW as a follow-on to the company’s successful delivery of 180 MW earlier this year.
July 28, 2022. By News Bureau

The combined 390 MW of Ampt optimizers will power Chile’s largest solar plus energy storage power plant initiative. Ampt’s patented optimizer technology plays a key role in the system by lowering overall capital costs, improving lifetime performance, and simplifying control of the hybrid PV+storage plant.
The two hybrid power plant projects total 390 MW of PV solar with 240 MW / 1.2 GWh of energy storage using lithium-ion batteries.
The batteries are connected to the solar array on the direct current (DC) side of the solar inverter – commonly referred to as 'DC-coupled' energy storage. Ampt String Optimizers provide the critical power management link between the PV system and the DC-coupled energy storage system.
“We are proud to support transmission-level renewable energy initiatives in Chile and around the world to accelerate toward a carbon-free, clean energy future,” said Levent Gun, Ampt CEO. “This latest 210 MW order is a testament to the strong relationships we build with our customers and partners, and the high value that Ampt’s patented technology brings to the utility-scale PV market.”
please contact: contact@energetica-india.net.