HomeRenewable energy ›Adani Green Commissions 180 MW Solar Power Plant in Rajasthan

Adani Green Commissions 180 MW Solar Power Plant in Rajasthan

The plant has a 25-year power purchase agreement (PPA) with the Solar Energy Corporation of India (SECI).

March 27, 2024. By News Bureau

Adani Green Energy Limited (AGEL) has commissioned a 180 MW solar power plant at Devikot in Jaisalmer, Rajasthan. The plant has a 25-year power purchase agreement (PPA) with the Solar Energy Corporation of India (SECI).

The 180 MW solar plant will produce approximately 540 million electricity units annually, powering over 1.1 lakh homes and reducing around 0.39 million tonnes of CO2 emissions. Next-generation bifacial solar PV modules and horizontal single axis solar trackers (HSAT) have been deployed to maximise generation through better efficiency of modules and tracking the sun throughout the day.

The plant is equipped with waterless robotic module cleaning systems, enabling water conservation in the barren region of Jaisalmer. The Energy Network Operation Centre (ENOC), anchored in the secured digital cloud platform, enables real-time monitoring of AGEL’s renewable energy assets, leading to enhanced operational performance.

With the successful commissioning of this plant, AGEL’s operational solar portfolio has increased to 6,243 MW, and the total operational renewable generation capacity to 9,784 MW, the largest in India.

AGEL continues to play a pivotal role in India’s renewable energy, contributing to the nation’s goal of achieving energy security and enabling India’s transition to a low-carbon economy.
Please share! Email Buffer Digg Facebook Google LinkedIn Pinterest Reddit Twitter
If you want to cooperate with us and would like to reuse some of our content,
please contact: contact@energetica-india.net.
 
 
Next events
 
 
Last interviews
 
Follow us