PM Modi Lays Foundation for 500 MWh BESS in Tamil Nadu
PM Modi has laid foundation for 250 MW/500 MWh BESS in Chennai, INR 17,000 crore VOC Port plan announced.
Policies & Regulations | 13/10/2026 | By EI News Network
Gopin Semicon Enters ALMM List-II, Total Solar Cell Capacity Under ALMM Reaches 37.8 GW
Surat-based Gopin Semicon has entered the MNRE’s ALMM List-II with 402 MW of N-type TOPCon solar cell capacity, taking the total listed cell manufacturing capacity to 37,795 MW.
Renewable energy / Solar PV | 12/10/2026 | By Mrinmoy Dey
India, Singapore Plan 2,000 MW Cross-Border Power Corridor
India and Singapore plan a 2,000 MW power link via Myanmar, Thailand and Malaysia for regional energy security.
Policies & Regulations | 09/10/2026 | By EI News Network
RE Industry Seeks GST Cuts for BESS, EPC Services Ahead of October 8 Council Meet
The renewable energy industry is seeking GST reductions on BESS and renewable energy EPC services along with review of Input Tax Credit (ITC) framework ahead of the GST Council meeting scheduled for October 8, 2026. Energetica India speaks with stakeholders to gauge expectations.
Policies & Regulations | 07/10/2026 | By Mrinmoy Dey
MNRE Proposes Standard Solar Cell Nomenclature Under ALMM-II
MNRE proposes 14-digit codes to standardise solar PV cell identification under ALMM List-II.
Business | 07/10/2026 | By EI News Network
Bondada Engineering Secures INR 816 Crore Solar EPC Contact from NTPC Green Energy
Bondada Engineering has secured an INR 816.01 crore EPC order from NTPC Green Energy for BOS works and three-year O&M of a 600 MW solar PV project at Fatehgarh, Rajasthan.
Renewable energy / Solar PV | 08/05/2026 | By Mrinmoy Dey
Genus Innovation Launches Hi-FLO Hybrid Solar Inverter at UP Energy Expo 2026
Genus Innovation has unveiled its Hi-FLO Hybrid Solar Inverter and Battery Management System to strengthen its distributed energy portfolio, targeting rising rooftop solar adoption and intelligent energy management demand across residential and commercial markets.
Renewable energy / Solar PV | 08/05/2026 | By News Bureau
Investments in Thermal Power Regain Momentum as Grid Stability Needs Rise: ICRA
ICRA expects India’s power demand to grow by 5-5.5 percent in 2026-27, with thermal capacity additions of 6 GW and overall generation capacity additions of around 50 GW during the year. Thermal PLF is estimated at around 65 percent in 2026-27.
Power R&D | 08/05/2026 | By Mrinmoy Dey
Tata Power, DGPC Expand Bhutan Clean Energy Partnership to Over 5 GW Hydropower Capacity
Tata Power and Druk Green Power Corporation have expanded their hydropower collaboration in Bhutan by adding the 404 MW Nyera Amari I and II project, taking the total identified capacity under the partnership to 5,033 MW and strengthening regional clean energy security.
Renewable energy / Hydropower | 08/05/2026 | By News Bureau
RenewSys Gets MNRE ALMM Approval for Bifacial N-Type TOPCon Solar PV Cells
RenewSys India’s Hyderabad-made bifacial N-Type TOPCon Solar PV Cells have been added to MNRE’s ALMM List-II, strengthening domestic solar manufacturing and India’s clean energy ambitions.
Renewable energy / Solar PV | 08/05/2026 | By News Bureau
Avaada Surpasses 17.7 GWp RE Portfolio with 7.2 GWp Operational and 10.5 GWp Under Construction
Avaada Group has crossed 17.7 GWp in its renewable energy portfolio, including 7.2 GWp operational and 10.5 GWp under construction, after adding over 2 GWp in FY 2025-26.
Business | 08/05/2026 | By Mrinmoy Dey
Enlight Metals Enters INR 20,000 Cr Slotted Angle Market With 25,000 MT Annual Capacity
Enlight Metals aims to bring scale and standardization to 95 percent fragmented segment; plans ramp-up from 1,200 to 4,000 tonnes per month.
Business | 08/05/2026 | By News Bureau
Govt Unveils Fast-Track FDI Approval Route for Solar, Battery and Wind Component Manufacturing
Govt. has revised FDI SOP to enable faster approvals for solar, battery and wind component manufacturing investments with tighter disclosure norms.
Policies & Regulations | 08/05/2026 | By EI News Network
GUVNL Invites Bids to Procure Power from 250 MW Wind Projects
Gujarat Urja Vikas Nigam has invited bids to procure power from 250 MW of grid-connected wind projects across India under Phase XI, with an additional greenshoe option of up to 250 MW. Bid submission ends on May 26, 2026.
Renewable energy / Wind Power | 08/05/2026 | By Mrinmoy Dey
IndiGrid Commissions 180 MW/360 MWh Standalone BESS Project in Gujarat
IndiGrid has announced the commissioning of a 180 MW/360 MWh Battery Energy Storage System project in Gujarat, jointly developed with EnerGrid and backed by Gujarat Urja Vikas Nigam as the off-taker.
Energy Storage | 08/05/2026 | By Mrinmoy Dey
