TAG: "wind blade manufacturing plant in Gujarat"

News

JSW Energy Commissions 600 MW-Equivalent Wind Blade Manufacturing Plant in Gujarat

JSW Energy has commissioned a 600 MW-equivalent wind blade manufacturing facility at Halol, Gujarat, with an annual capacity of 450 blades for 4 MW wind turbines, bolstering domestic manufacturing and supply chain integration.

Wind Blade Manufacturing Plant In Gujarat | June 09, 2026 | By Mrinmoy Dey 480

Articles

This category has no news at the moment.

Interviews

This category has no news at the moment.


 
 
Next events
 
 
Last interviews
 
Follow us