TAG: "vertical integration in Solar PV"
News
Saatvik Green Energy Commissions 2 GW In-House EPE Film Manufacturing Facility
Saatvik Green Energy has commissioned a 2 GW in-house EPE film manufacturing facility at its Ambala campus in Haryana, deepening vertical integration and strengthening supply-chain self-reliance in solar module manufacturing.
Vertical Integration In Solar PV | December 23, 2025 | By Mrinmoy Dey | 1052
Vikram Solar Approves INR 4,371 Crore Capex for 5 GWh BESS Manufacturing Plant in Tamil Nadu
Vikram Solar has approved a capital expenditure of about INR 4,371 crore to set up a 5 GWh battery energy storage system (BESS) manufacturing facility in Tamil Nadu, through its subsidiary VSL Powerhive, as part of its phased BESS expansion strategy.
Vertical Integration In Solar PV | December 18, 2025 | By Mrinmoy Dey | 1629
Cosmic PV Power Expands into BESS, Signs MoU with Indygreen Technologies for 2 GW Line at REI 2025
Cosmic PV Power has signed a Memorandum of Understanding (MoU) with Indygreen Technologies at REI Expo 2025 to set up a 2 GW lithium-ion battery production line for Battery Energy Storage Systems (BESS). The line is expected to be commissioned by March 2026.
Vertical Integration In Solar PV | November 01, 2025 | By Mrinmoy Dey | 1576
Pahal Solar Breaks Ground for 2 GW Solar Cell and 2 GW Aluminium Frame Manufacturing Plant in Surat
Pahal Solar has performed the Bhoomi Poojan for a new manufacturing complex in Surat with a 2 GW solar cell plant and a 2 GW aluminium frame facility. The plants are expected to be operational by late 2026.
Vertical Integration In Solar PV | October 28, 2025 | By Mrinmoy Dey | 5155
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
