TAG: "UTL Solar new cell manufacturing plant"
News
UTL Solar Enters ALMM List-II for Solar Cells, Total Enlisted Capacity Reaches 27,227 MW
Fujiyama Power Systems (UTL Solar) has entered the ALMM List-II for solar PV cells by adding 437 MW of Mono PERC solar cells capacity, taking the total enlisted capacity to 27,227 MW.
UTL Solar New Cell Manufacturing Plant | February 16, 2026 | By Mrinmoy Dey | 860
Fujiyama Power Systems Commissions 1 GW Solar Cell Plant in Uttar Pradesh
Fujiyama Power Systems (UTL Solar) has announced the planned commissioning of a 1 GW Mono PERC solar cell manufacturing plant at Dadri, Uttar Pradesh, with an investment of around INR 300 crore.
UTL Solar New Cell Manufacturing Plant | January 22, 2026 | By Mrinmoy Dey | 1129
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
