TAG: "TPREL Signs BESPA with NHPC"
News
TPREL Signs BESPA with NHPC for 30MW/120MWh BESS at 220kV Substation in Kerala

The project, secured under NHPC’s BESS Tranche-I tender through a competitive bidding route for Kerala State Electricity Board Limited being the end user of the Battery Energy Storage System (BESS) asset, involves setting up a 30 MW / 120 MWh battery storage system at the 220 kV substation in Area code, Kerala.
TPREL Signs BESPA With NHPC | July 18, 2025 | By News Bureau | 550
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.