TAG: "TPREL Signs BESPA with NHPC"

News

TPREL Signs BESPA with NHPC for 30MW/120MWh BESS at 220kV Substation in Kerala

The project, secured under NHPC’s BESS Tranche-I tender through a competitive bidding route for Kerala State Electricity Board Limited being the end user of the Battery Energy Storage System (BESS) asset, involves setting up a 30 MW / 120 MWh battery storage system at the 220 kV substation in Area code, Kerala.

TPREL Signs BESPA With NHPC | July 18, 2025 | By News Bureau 550

Articles

This category has no news at the moment.

Interviews

This category has no news at the moment.


 
 
Next events
 
 
Last interviews
 
Follow us