TAG: "TPREL"

News

TPREL Signs PPA with SJVN for 460 MW FDRE Project

The plant, designed to meet the 460 MW FDRE requirement, integrates solar, wind, and battery storage technologies to ensure efficient energy dispatch during peak hours, thereby stabilizing the grid.

TPREL | May 04, 2024 | By News Bureau 471

TPREL Signs PDA with Tata Communications for 18.75 MW AC Group Captive Solar Plant

Located in Aachegaon, Maharashtra, the plant is projected to generate approximately 40 MUs of power while offsetting more than 30,000 tonnes of CO2 emissions annually.

TPREL | February 14, 2024 | By News Bureau 484

TPREL Lights Up Asia's Largest Tea Estate with Bifacial Solar System

Overcoming challenging monsoon conditions spanning 3.5 months, the project involved installing approximately 1,900 modules and was completed within an impressive six-month timeframe.

TPREL | February 03, 2024 | By Abha Rustagi 819

TPREL and Gujarat Government Ink INR 70,000 Crore MoU for 10,000 MW RE Project

The project entails the development of 10,000 MW Renewable Energy Power projects.

TPREL | January 12, 2024 | By Abha Rustagi 867

Tata Power Renewable Energy Inks PDA with Dr. Abhay Firodia Group

Under the terms of the agreement, Force Motors Limited, a fully vertically integrated automobile company, is poised to utilize 6.2 MW AC power, consuming 13.64 MUs annually.

TPREL | December 14, 2023 | By Abha Rustagi 954

TPREL Crosses 1.4 GW Capacity of Group Captive Projects

TPREL is also set to construct a 41MW captive solar plant for Tata Power’s upcoming 4.3GW Solar cell & module manufacturing facility in Tamil Nadu.

TPREL | November 20, 2023 | By News Bureau 875

Tata Power Appoints Deepesh Nanda as President-Renewables and CEO & MD of TPREL

Tata Power announced the appointment of Deepesh Nanda as President-Renewables and CEO & MD of Tata Power Renewable Energy Limited (TPREL), a subsidiary of Tata Power, with effect from November 1, 2023.

TPREL | November 01, 2023 | By News Bureau 1394

TPREL Inks PDA with Endurance Technologies to Develop 12.5 MW Captive Solar Plant

The plant will be set up at Aachegaon in Maharashtra and will generate 27.5 million units (MUs) of electricity every year. This will help in reducing Endurance Technologies' carbon footprints and mitigate approximately 9,125 metric tonnes (MT) of carbon emissions annually.

TPREL | October 16, 2023 | By News Bureau 792

TPREL Signs PDA with Neosym Industry for 26 MW AC Group Captive Solar Plant in Maharashtra

The project, located at Jamkhed, Ahmednagar in Maharashtra with an anticipated electricity generation capacity of 59 million units annually will start from March 2024.

TPREL | September 04, 2023 | By News Bureau 1113

TPREL Signs PDA for 4.4 MW AC Group Captive Solar Plant with ANAND Group

Under this agreement, Tata Power Renewable Energy Limited will facilitate the generation of 10 million units of clean energy through renewable sources.

TPREL | August 29, 2023 | By News Bureau 995

Articles

This category has no news at the moment.

Interviews

This category has no news at the moment.


 
 
Next events
 
 
Last interviews
 
Follow us