TAG: "solarising C and I segment"

News

AMPIN Energy Transition Commissions 60 MWp Group Captive C&I Open Access Solar Project in Odisha

AMPIN Energy Transition has commissioned a 60 MWp group captive open access solar project at Kantabanji in Odisha, the first under the state’s OREP-22 policy.

Solarising C And I Segment | April 27, 2026 | By Mrinmoy Dey 224

Solidus Techno Power Commissions 40 MW/60 MWp Captive Open Access Solar Project in Punjab

Solidus Techno Power has commissioned a 40 MW/60 MWp captive open access solar project in Punjab, taking its total installed solar capacity in North India to 200 MW.

Solarising C And I Segment | April 22, 2026 | By Mrinmoy Dey 384

Luminous, SIDBI Sign MoU to Offer Up to INR 50 Crore Solar Loans for MSMEs

Luminous Power Technologies has signed an MoU with the Small Industries Development Bank of India (SIDBI) to enable MSMEs to access solar loans of up to INR 50 crore with tenures of up to 10 years.

Solarising C And I Segment | April 22, 2026 | By Mrinmoy Dey 446

CleanMax to Supply Power to Shell India from 30 MW Wind-Solar Hybrid Projects in Gujarat and Karntaka

CleanMax has signed an agreement with Shell India to supply hybrid wind-solar power to the latter’s assets in Gujarat and Karnataka from about 30 MW hybrid renewable projects under a group-captive model.

Solarising C And I Segment | April 21, 2026 | By Mrinmoy Dey 376

Fourth Partner Energy Signs 28 MW Wind-Solar Hybrid PPA with Hyundai Motor Group

Fourth Partner Energy has signed an agreement to supply about 28 MW of wind-solar hybrid power to Hyundai Motor Group and its affiliates from its upcoming wind-solar hybrid park in Tamil Nadu.

Solarising C And I Segment | April 15, 2026 | By Mrinmoy Dey 488

CleanMax to Supply 50 MW Wind-Solar Hybrid Power to Sangam India in Rajasthan

Clean Max Enviro Energy Solutions has partnered with textile manufacturer Sangam India to supply 30 MWp solar and 20 MW wind power augmented with a 2 MWh battery energy storage system (BESS) across five facilities in Rajasthan. CleanMax will supply power from its Bhikamkor hybrid farm under an intra-state group captive structure.

Solarising C And I Segment | April 15, 2026 | By Mrinmoy Dey 490

Mahindra and Mahindra to Procure Solar Power from 30 MW Group Captive Solar Project in Punjab

Mahindra & Mahindra will procure solar power from a 30 MW captive project in Punjab being developed by its step-down subsidiary Neon Hybren, a SPV of Mahindra Susten. The company has approved an investment of up to INR 11.17 crore to pick up a 26 percent stake as per captive consumption regulations.

Solarising C And I Segment | April 10, 2026 | By Mrinmoy Dey 399

Sunsure Energy Signs Solar Open-Access PPAs to Supply 30 MWp Power to Wonder Cement

Sunsure Energy has signed three long-term solar open-access PPAs with Wonder Cement to supply 30 MWp of power from projects in Maharashtra and Uttar Pradesh, offsetting 33,000 tonnes of CO₂ annually. With this, Wonder Cement will replace 67 percent of electricity consumption at the Dhule plant and 52 percent at the Aligarh plant with clean energy.

Solarising C And I Segment | April 08, 2026 | By Mrinmoy Dey 458

Roofsol Energy Signs 2 MWp Solar PPA with Whirlpool India

Roofsol Energy has signed a 2 MWp OPEX-based Solar Power Purchase Agreement (PPA) with Whirlpool India for its Pune facility, targeting annual generation of up to 3.5 million units of green power.

Solarising C And I Segment | April 06, 2026 | By Mrinmoy Dey 684

KP Energy Secures 91.4 MW Wind-Solar Hybrid Project from JK Paper in Gujarat

KP Energy has secured a 91.4 MW wind-solar hybrid project from JK Paper in Gujarat, covering end-to-end development, grid connectivity, and O&M services.

Solarising C And I Segment | March 30, 2026 | By Mrinmoy Dey 477

Articles

This category has no news at the moment.

Interviews

Industry is Shifting from Standalone Solar to Integrated Energy Solutions: MD, Truzon Solar

Ch. Bhavani Suresh, Founder and Managing Director at Suntek Energy Systems (Truzon Solar)

Solarising C And I Segment | March 02, 2026 | By Mrinmoy Dey 955

Shree Cement Aims to Increase RE Intake to Over 60 Percent in FY26: MM Rathi

MM Rathi, Joint President – Power Management at Shree Cement

Solarising C And I Segment | August 08, 2025 | By Mrinmoy Dey 1909


 
 
Next events
 
 
Last interviews
 
Follow us