TAG: "Shripad Yesso Naik"
News
MoS Power and MNRE Shripad Naik Inaugurates IREDA’s 45 kW Solar CSR Project for Goa Water Supply
Union Minister of State for Power and New and Renewable Energy Shripad Naik has inaugurated a 45 kW on-grid solar power system at a water pumping station in North Goa under IREDA’s CSR initiative.
Shripad Yesso Naik | October 06, 2025 | By Mrinmoy Dey | 418
The fifth GoM meeting, chaired by Union Minister Manohar Lal, focused on reform-based debt restructuring, full-cost tariff orders, and state liability measures to strengthen financial viability of power distribution utilities.
Shripad Yesso Naik | September 18, 2025 | By EI News Network | 1064
India Set to Become Global Hub for Green Hydrogen Innovation: MoS MNRE Shripad Yesso Naik
India is betting on green hydrogen to decarbonise hard-to-abate industries, reduce import dependence, establish India as a key exporter in the emerging global hydrogen economy, stated Union Minister of State for New and Renewable Energy Shripad Yesso Naik said at the first Green Hydrogen R&D Conference.
Shripad Yesso Naik | September 13, 2025 | By Mrinmoy Dey | 897
India aims to establish a fully indigenous solar value chain, with indigenous cell manufacturing by 2028, advancing from modules to cells to wafers and ingots to boost self-reliance, stated MNRE Minister Pralhad Joshi. Nearly 20 lakh households have benefited under PM Surya Ghar Yojana, and the second phase of PM-KUSUM will be launched after March 2026.
Shripad Yesso Naik | September 11, 2025 | By Mrinmoy Dey | 1607
43 GWh of BESS Supported Under VGF Scheme with INR 9,160 Cr Outlay: Power Minister
To strengthen grid reliability and accelerate the clean energy transition, the Ministry of Power launched the Viability Gap Funding scheme to support 43 GWh of Battery Energy Storage Systems (BESS), allocating INR 9,160 crore, stated Union Power Minister Manohar Lal during a high-level Consultative Committee meeting.
Shripad Yesso Naik | August 06, 2025 | By Mrinmoy Dey | 707
India Meets 2030 Clean Power Goal Early Amid 11 GW Tender Cancellations
India has achieved 50 percent non-fossil power capacity ahead of 2030, even as over 11 GW of renewable tenders were cancelled and 43 GW of PPAs remain unsigned due to market challenges.
Shripad Yesso Naik | July 31, 2025 | By EI News Network | 1542
Centre Powers Solar Push for Farmers, States Catching Up Gradually
The Centre is promoting solar adoption in agriculture through PM-KUSUM subsidies, but state-level implementation remains uneven. While some regions show progress, overall installation rates still lag behind.
Shripad Yesso Naik | July 24, 2025 | By EI News Network | 962
Rooftop Solar Installations under PM Surya Ghar Yojana Crosses 15 Lakh
As per Ministry of New and Renewable Energy data, a total of 15.45 lakh households have benefitted through the installation of rooftop solar plants under the PM Surya Ghar Muft Bijli Yojana. Gujarat leads the adoption with 5,23,615 installations, followed by Maharashtra (3,71,954) and Uttar Pradesh (1,64,646).
Shripad Yesso Naik | July 24, 2025 | By Mrinmoy Dey | 1412
Government Accelerates Smart Meter Deployment Under RDSS Scheme
The Power Ministry reported 3.46 crore smart meters installed across India, with 20.33 crore sanctioned under RDSS, aiming to boost operational efficiency and cut losses in the power sector.
Shripad Yesso Naik | July 23, 2025 | By EI News Network | 3465
Out of 8 States, Phase-I of Green Energy Corridor Facing Delays in 4 States: Shripad Yesso Naik
The INR 10,141.68 crore Phase-I Green Energy Corridor project is facing delays in Andhra Pradesh, Gujarat, Maharashtra, and Himachal Pradesh due to land, legal, and environmental hurdles, the MoS Power and New and Renewable Energy Shripad Yesso Naik informed the Rajya Sabha.
Shripad Yesso Naik | July 23, 2025 | By Mrinmoy Dey | 1306
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
