TAG: "Shanghai Electric "
News

Shanghai Electric has announced that the company's EW8.X-230 wind turbine generator has been named one of the Top 10 Offshore Turbines of the Year 2022, according to the latest report by Wind Power Monthly.
Shanghai Electric | February 21, 2023 | By News Bureau | 943
Shanghai Electric's Solar Thermal Trough Unit No. 1 Project in Dubai Connects to the Grid

The Trough Unit No. 1 facility of Shanghai Electric's 700MW solar thermal and 250MW photovoltaic solar power plant in Dubai has successfully achieved grid-connected electricity generation, marking a significant milestone along the path of the firm's entry into the renewable energy sector.
Shanghai Electric | December 01, 2022 | By News Bureau | 1049
Shanghai Electric Opens Block B in Phase Five of MBR Solar Park

The opening ceremony for commercial operations of Block B in phase five at Shanghai Electric's Mohammed bin Rashid Al Maktoum Solar Park (MBR Phase V) facility in Dubai was held at the site on October 10.
Shanghai Electric | October 11, 2022 | By News Bureau | 709
Shanghai Electric Jumps to 40th on ENR's 2022 Top 250 International Contractors List

Shanghai Electric moved up to 40th place on the 2022 Top 250 International Contractors list released by Engineering News-Record (ENR).
Shanghai Electric | September 09, 2022 | By News Bureau | 673

Shanghai Electric announced that Phase B of the 900-MW fifth phase of the Mohammed bin Rashid Al Maktoum Solar Park has entered operation.
Shanghai Electric | September 03, 2022 | By News Bureau | 1017

Shanghai Electric Wind Power Group Co., Ltd.'s (Shanghai Electric) first EW8.X-230 wind turbine generator rolled off the production line at the Putian manufacturing facility, representing a new milestone in China's offshore wind power parity market.
Shanghai Electric | June 27, 2022 | By News Bureau | 1294
Shanghai Electric Completes Trial Operation of Fuqing Nuclear Power Unit 6

Fuqing Nuclear Power Unit 6, which Shanghai Electric helped to build, completed 168 hours of trial operation making it ready for commercial operation.
Shanghai Electric | April 16, 2022 | By News Bureau | 578

Shanghai Electric announced that the first molten salt tank hydro test for the Parabolic Trough Plant-II (PT2) of the fourth phase of Mohammed bin Rashid Al Maktoum Solar Park was carried out on May 9, the positive results of which laid a crucial foundation for the next phase of the molten salt system commission.
Shanghai Electric | June 14, 2021 | By News Bureau | 923
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.