TAG: "Priyansh Mohan"

News

NTPC Simhadri to Pilot Indigenous Iron-Air Battery Technology for Long-Duration Energy Storage

NTPC Simhadri Thermal Power Station will host a pilot project to assess Meine Electric’s indigenous Iron-Air Battery technology for long-duration energy storage. The initiative will evaluate technical performance, reliability and operational characteristics under real-world utility conditions, with the six-hour charge and 18-hour discharge capability.

Priyansh Mohan | August 17, 2026 | By News Bureau 341

Meine Electric Unveils Fast-Charging Iron-Air Battery for Daily Long-Duration Energy Storage

Meine Electric introduces a fast-charging iron-air battery system featuring a proprietary Fast Charge Long Discharge technology, independently validated by CES that is designed to support daily renewable energy storage with a 6-hour charging cycle and 18-hour discharge capability.

Priyansh Mohan | July 14, 2026 | By News Bureau 756

Meine Electric Raises USD 750,000 Pre-Seed Funding to Scale Iron Air Long Duration Energy Storage Technology

Meine Electric raises USD 750,000 in pre-seed funding from Antler, Rebalance, Venture Catalysts, gradCapital, AIC-AU Incubation Foundation and angel investor Alexander Hogeveen Rutter to scale iron-air long-duration energy storage.

Priyansh Mohan | January 23, 2026 | By News Bureau 1850

Articles

This category has no news at the moment.

Interviews

This category has no news at the moment.


 
 
Next events
 
 
Last interviews
 
Follow us