TAG: "Peak Power Supply"

News

SECI Invites Bids for 4,800 MWh Assured Peak Supply for ISTS-connected RE Projects

Solar Energy Corporation of India has issued a tender for assured peak supply of 4800 MWh (1200 MW x 4 Hrs.) from ISTS-connected RE projects in India. Bid submission ends on July 20, 2026.

Peak Power Supply | June 09, 2026 | By Mrinmoy Dey 515

Adyant Enersol, Serentica, Ampin and ACME Win SECI’s 4,800 MWh FDRE Auction

Adyant Enersol (Datta Infra), Serentica Renewables India, AMPIN Energy Transition, and ACME Solar emerged as winners in Solar Energy Corporation of India’s 4,800 MWh (1,200 MW x 4 hours) assured peak supply FDRE auction at a tariff of INR 6.27–6.28/kWh.

Peak Power Supply | February 06, 2026 | By Mrinmoy Dey 1474

Yanara Signs PPA with NHPC to Supply 120 MW of FDRE

Yanara (formerly BrightNight APAC) has signed a firm and dispatchable renewable energy (FDRE) PPA with NHPC to supply 120 MW of FDRE (peak power supply) from its 350 MW solar-wind-battery hybrid project in Rajasthan at a tariff of INR 4.55/kWh.

Peak Power Supply | August 26, 2025 | By Mrinmoy Dey 1457

Articles

This category has no news at the moment.

Interviews

This category has no news at the moment.


 
 
Next events
 
 
Last interviews
 
Follow us