TAG: "Oyster Green Hybrid Three and Kshema Power"
News
Oyster Green Hybrid Three, Kshema Power to Build 350 MW Transmission Infrastructure in MP
Kshema Power will develop a 51-km transmission line and 33/220 kV AIS substation for Oyster’s 350 MW hybrid project in Madhya Pradesh, boosting renewable evacuation capacity and strengthening high-capacity wind-solar integration.
Oyster Green Hybrid Three And Kshema Power | December 11, 2025 | By EI News Network | 531
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
