TAG: "MNRE Notification"
News
MNRE Notifies SOP to Address Vendor Violations under PM Surya Ghar
The Ministry of New and Renewable Energy has introduced a formal grievance redressal and enforcement framework under PM Surya Ghar, enabling temporary deactivation of vendors that fail to address consumer complaints, rectify defects or comply with quality standards.
MNRE Notification | June 24, 2026 | By Mrinmoy Dey | 1871
MNRE Clarifies Scope of Solar Thermal QCO, Excludes Glass Evacuated Solar Collector Tubes
The Ministry of New and Renewable Energy has clarified that Glass Evacuated Solar Collector Tubes are not covered under the Solar Thermal Systems, Devices and Components (Quality Control) Order, 2024.
MNRE Notification | June 22, 2026 | By Mrinmoy Dey | 496
MNRE Empanels RECPDCL, REIL as SIPs for Government Rooftop Solar Under PM Surya Ghar
Ministry of New and Renewable Energy has designated REC Power Development and Consultancy Ltd. and Rajasthan Electronics and Instruments Ltd. as additional Scheme Implementation Partners for rooftop solar installations on government buildings under the PM Surya Ghar: Muft Bijli Yojana.
MNRE Notification | June 17, 2026 | By Mrinmoy Dey | 792
MNRE Allows ALMM Listing of Solar Modules up to 3 Percent Higher Wattage Without Factory Inspection
The Ministry of New and Renewable Energy has allowed solar PV module models with up to 3 percent higher wattage than an already ALMM-listed model to be enlisted without a fresh factory inspection, provided they are manufactured on the same production line and facility.
MNRE Notification | June 09, 2026 | By Mrinmoy Dey | 1046
MNRE Seeks Monthly Solar Cell and Module Price Data from ALMM-Listed Manufacturers
The Ministry of New and Renewable Energy has directed all ALMM-listed solar cell and module manufacturers to report monthly price ranges of domestically manufactured products to the National Institute of Solar Energy, aiming to enhance market transparency and prevent profiteering amid the implementation of ALMM List-II from June 1, 2026.
MNRE Notification | June 04, 2026 | By Mrinmoy Dey | 1376
MNRE Rules Out Blanket Extension for ALMM List-II Deadline, Allows Case-Specific Exemptions
Ministry of New and Renewable Energy has ruled out a blanket extension of the June 1, 2026 ALMM List-II compliance deadline for solar cells, while allowing project-specific exemptions for net-metering and open access projects that had achieved substantial progress before the cutoff date.
MNRE Notification | May 26, 2026 | By Mrinmoy Dey | 1291
MNRE Allows ZAM Alloy in Rooftop Solar Mounting Structures Under PM Surya Ghar Scheme
The Ministry of New and Renewable Energy (MNRE) has expanded the list of approved materials for rooftop solar module mounting structures under the PM Surya Ghar scheme by permitting the use of Zinc Aluminium Magnesium (ZAM) alloy.
MNRE Notification | May 25, 2026 | By Mrinmoy Dey | 1116
MNRE Discontinues Vendor Undertaking for Repeated Solar Module, Inverter Serial Numbers
The Ministry of New and Renewable Energy has tightened compliance norms under the PM Surya Ghar: Muft Bijli Yojana by discontinuing the undertaking-based provision for repeated solar module and inverter serial numbers and mandating automated verification through the National Institute of Solar Energy’s integrated DCR portal system.
MNRE Notification | May 13, 2026 | By Mrinmoy Dey | 1205
MNRE Mandates 10-Year Product and 25-Year Performance Warranty for Solar Modules
MNRE has introduced a standardised warranty framework mandating a minimum 10-year product warranty covering defects in design, materials and workmanship, along with a 25-year limited power output warranty for solar PV modules, under its DRE schemes, including PM Surya Ghar: Muft Bijli Yojana and PM KUSUM Yojana.
MNRE Notification | May 11, 2026 | By Mrinmoy Dey | 2479
MNRE Notifies Fee Structure for ALMM-Wind and Wind Turbine Components Inclusion
Ministry of New and Renewable Energy has issued a circular specifying application fees of INR 3 lakh per model (with inspection) and INR 50,000 (document updation without inspection) for inclusion and updation under ALMM-Wind and ALMM-WTC.
MNRE Notification | April 14, 2026 | By Mrinmoy Dey | 823
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
