TAG: "Ministry of Power Directives"
News
MoP Orders Coal-based Captive Power Plants Above 50 MW to Maximise Output, Sell Surplus
The Ministry of Power has directed 112 captive coal-based generating stations with installed capacity of 50 MW and above to operate at the maximum available capacity from October 1 to December 31, 2026, and offer surplus power through power exchanges, amid expectations of rising electricity demand in the coming months.
Ministry Of Power Directives | September 28, 2026 | By Mrinmoy Dey | 624
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
