TAG: "Meine Electric"
News
NTPC Simhadri to Pilot Indigenous Iron-Air Battery Technology for Long-Duration Energy Storage
NTPC Simhadri Thermal Power Station will host a pilot project to assess Meine Electric’s indigenous Iron-Air Battery technology for long-duration energy storage. The initiative will evaluate technical performance, reliability and operational characteristics under real-world utility conditions, with the six-hour charge and 18-hour discharge capability.
Meine Electric | August 17, 2026 | By News Bureau | 271
Meine Electric Unveils Fast-Charging Iron-Air Battery for Daily Long-Duration Energy Storage
Meine Electric introduces a fast-charging iron-air battery system featuring a proprietary Fast Charge Long Discharge technology, independently validated by CES that is designed to support daily renewable energy storage with a 6-hour charging cycle and 18-hour discharge capability.
Meine Electric | July 14, 2026 | By News Bureau | 754
Meine Electric raises USD 750,000 in pre-seed funding from Antler, Rebalance, Venture Catalysts, gradCapital, AIC-AU Incubation Foundation and angel investor Alexander Hogeveen Rutter to scale iron-air long-duration energy storage.
Meine Electric | January 23, 2026 | By News Bureau | 1849
Articles
This category has no news at the moment.
Interviews
Iron-Air Batteries Can Power India’s Renewable Ambitions: Stuti Kakkar, Meine Electric
Stuti Kakkar, Co-Founder & COO at Meine Electric
Meine Electric | May 28, 2026 | By News Bureau | 1106
