TAG: "JSW Energy locked-in generation capacity "

News

JSW Energy Commissions 250 MW Renewable Energy Capacity Since April 2026

JSW Energy has commissioned about 250 MW of renewable energy capacity since April 2026, including 130 MW of wind, 69.4 MW of solar and 50 MW from the Tidong Hydro plant, raising its total installed capacity to 13.7 GW.

JSW Energy Locked-in Generation Capacity | May 18, 2026 | By Mrinmoy Dey 487

Articles

This category has no news at the moment.

Interviews

This category has no news at the moment.


 
 
Next events
 
 
Last interviews
 
Follow us