TAG: "Interstate Transmission System"
News
AMPIN Commissions ~500 MW ISTS Wind–Solar Hybrid Project in Rajasthan
AMPIN commissions 500 MW hybrid project in Rajasthan, supplying DISCOMs and corporates, boosting reliable renewable power and reducing emissions significantly.
Interstate Transmission System | May 04, 2026 | By EI News Network | 558
Jyoti Structures Commissions 400 kV Gadag–II Transmission Line for ReNew Power in Karnataka
Jyoti Structures has completed the 400 kV Gadag–II transmission line project in Karnataka for ReNew Power, enabling renewable power evacuation from the 1,500 MW Koppal Solar Energy Zone.
Interstate Transmission System | March 05, 2026 | By News Bureau | 752
Reliance Infra Receives LOA from NHPC for 390 MW Solar Power and BESS Project
The Reliance Infra. project will have an installation of 700 MW Solar DC capacity and 780 MWhr of BESS capacity.
Interstate Transmission System | August 19, 2025 | By News Bureau | 1197
100 Percent ISTS-charge Waiver for Co-located BESS Projects Commissioned Before June 30, 2028
The Ministry of Power has amended the ISTS charges waiver policy, granting 100 percent exemption for Hydro PSP and co-located BESS projects commissioned or awarded by June 30, 2028, under specified conditions.
Interstate Transmission System | June 10, 2025 | By Mrinmoy Dey | 2351
Inter-State Transmission Capex to Double to INR 1 Lakh Crore in FY26-27
India plans to invest INR 1 lakh crore in inter-state transmission by FY 26-27, doubling previous spending. This aims to support 65-75 GW of renewable capacity additions. Key challenges include project delays, ROW issues, and supply chain constraints, with policy measures aiding execution.
Interstate Transmission System | February 28, 2025 | By EI News Network | 2528
Government Revises TBCB Guidelines for Grid-Connected Solar PV Projects
The Ministry of Power (MoP) has amended Tariff-Based Competitive Bidding (TBCB) guidelines for solar PV projects, introducing location-specific bids, revised CUF penalties, faster PPA timelines, new financial instruments, enhanced technical standards, and stricter compliance with cybersecurity regulations.
Interstate Transmission System | February 20, 2025 | By EI News Network | 2945
MoP Amends TBCB Guidelines for Wind Power Projects
The Ministry of Power (MoP) amended Tariff-Based Competitive Bidding (TBCB) guidelines for procurement of power from grid-connected wind power projects, introducing location-specific bids, new financial instruments, stricter CUF compliance, and faster PPA timelines to enhance transparency and accelerate renewable energy deployment.
Interstate Transmission System | February 20, 2025 | By EI News Network | 2218
MoP Amends TBCB Guidelines for Grid-Connected Wind-Solar Hybrid Projects
The Ministry of Power (MoP) has revised Tariff-Based Competitive Bidding (TBCB) guidelines for procurement of power from grid-connected wind-solar hybrid projects, introducing location-specific bids, faster PPA execution and new performance guarantee options.
Interstate Transmission System | February 19, 2025 | By EI News Network | 2270
MoP Amends Guidelines for TBCB to Procure Firm Power from RE Projects with Storage
The Ministry of Power (MoP) has amended guidelines for tariff-based competitive bidding (TBCB) to procure firm and dispatchable power from renewable energy projects with storage systems, introducing changes to approvals, technical criteria, penalties, and contract timelines.
Interstate Transmission System | February 19, 2025 | By EI News Network | 2594
RECPDCL Invites Bids for TSP to Boost Capacity at Lakadia Substation, Gujarat
REC Power Development and Consultancy Ltd. (RECPDCL) has issued an RFP to select a Transmission Service Provider (TSP) through a tariff-based competitive bidding process for augmenting the transformation capacity at the 765/400 kV Lakadia Substation in Gujarat.
Interstate Transmission System | September 20, 2024 | By EI News Network | 1710
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
