TAG: "Gujarat Energy Development Agency"
News
KPI Green Energy Commissions 200 MW Solar Capacity for Coal India
The commissioned capacity is part of a 300 MW EPC solar project at GIPCL's Khavda Solar Park in Gujarat and has been certified by the Gujarat Energy Development Agency.
Gujarat Energy Development Agency | July 20, 2026 | By News Bureau | 692
Coal India Commissions 200 MW at Khavda Solar Project, Total Solar Capacity Reaches 557 MW
Coal India has commissioned 200 MW of its 300 MW solar power project at Khavda, Gujarat, taking its total installed solar capacity to 557 MW.
Gujarat Energy Development Agency | July 20, 2026 | By Mrinmoy Dey | 603
GERC Releases Draft BESS Regulations to Boost Gujarat’s Grid Flexibility and Storage Push
GERC has drafted regulations for battery energy storage systems, defining ownership, bidding, SLDC dispatch, minimum size, and operational framework across Gujarat.
Gujarat Energy Development Agency | May 27, 2026 | By EI News Network | 958
Gujarat Unveils Renewable Energy Regulations, Aims for 43 Percent by 2030
Gujarat Electricity Regulatory Commission has enforced new renewable procurement regulations, mandating rising RPO and storage obligations for DISCOMs, open access users, and captive plants, with penalties for non-compliance.
Gujarat Energy Development Agency | August 22, 2025 | By EI News Network | 4037
GEDA Invites Bids for Empanelling Consultants for Research on Solar Waste Recycling
The Gujarat Energy Development Agency (GEDA) has invited Expressions of Interest (EoI) to select a consultant firm or expert agency for preparing a feasibility report on recovering valuable materials from solar waste and e-waste. Bid submission ends on May 23, 2025.
Gujarat Energy Development Agency | May 13, 2025 | By Mrinmoy Dey | 1211
NTPC Green Energy Commissions Full 150 MW Gujarat Solar Project
NTPC Green Energy has fully commissioned its 150 MW Gujarat Solar PV Project, with the final 60 MW becoming operational on April 16, 2025, under GUVNL’s 500 MW Solar Phase XII tender.<br />
Gujarat Energy Development Agency | May 03, 2025 | By EI News Network | 1698
GEDA Issues Guidelines for Off-Grid Solar, Wind and Wind-Solar Hybrid Projects in Gujarat
Gujarat Energy Development Agency (GEDA) has issued a detailed procedure, instructions, guidelines and terms and conditions for setting up off-grid solar, wind, and wind-solar hybrid with or without storage.
Gujarat Energy Development Agency | January 28, 2025 | By Mrinmoy Dey | 7369
GERC Releases Draft Regulations for RE Procurement in Gujarat
GERC has released draft regulations for renewable energy procurement in Gujarat, focussing on strict Renewable Purchase Obligations (RPO), energy storage, and compliance through RECs. Feedback is invited until October 18, 2024, with a public hearing on October 25, 2024.
Gujarat Energy Development Agency | October 03, 2024 | By EI News Network | 3090
Gujarat's Visionary Renewable Energy Policy Targets 50 Percent Green Power by 2030
The government of Gujarat, has introduced the Gujarat Renewable Energy Policy-2023, with a goal to generate 50 percent of its power from renewable energy sources by 2030.
Gujarat Energy Development Agency | October 12, 2023 | By News Bureau | 3498
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
