TAG: " grid interactive distributed renewable energy sys"

News

OERC Releases Draft Grid Interactive Distributed Renewable Energy Regulations 2026 for Odisha

OERC has released draft regulations for grid interactive distributed renewable energy systems, proposing mandatory BESS, six metering mechanisms, charge exemptions and a modernised framework, with stakeholder comments invited until August 31, 2026.

Grid Interactive Distributed Renewable Energy Sys | August 08, 2026 | By EI News Network 279

Articles

This category has no news at the moment.

Interviews

This category has no news at the moment.


 
 
Next events
 
 
Last interviews
 
Follow us