TAG: "Fujiyama Power Systems"
News
Fujiyama Power Systems Approves 1.2 GW TopCon Solar Cell Facility in Madhya Pradesh
Fujiyama Power Systems will establish a 1.2 GW TopCon solar cell manufacturing facility at Ratlam, Madhya Pradesh, enhancing domestic solar manufacturing capacity and supporting India’s growing rooftop solar demand under the PM Surya Ghar Muft Bijli Yojana.
Fujiyama Power Systems | May 22, 2026 | By News Bureau | 790
UTL Solar Commissions 2,000 MW Solar Module Plant in Ratlam, Madhya Pradesh
Fujiyama Power Systems (UTL Solar) has commissioned a 2,000 MW solar panel manufacturing facility in Ratlam, Madhya Pradesh, while inverter and battery manufacturing lines at the same site are scheduled for commissioning in Q1FY27 and Q2FY27, respectively.
Fujiyama Power Systems | May 15, 2026 | By Mrinmoy Dey | 623
UTL Solar Enters ALMM List-II for Solar Cells, Total Enlisted Capacity Reaches 27,227 MW
Fujiyama Power Systems (UTL Solar) has entered the ALMM List-II for solar PV cells by adding 437 MW of Mono PERC solar cells capacity, taking the total enlisted capacity to 27,227 MW.
Fujiyama Power Systems | February 16, 2026 | By Mrinmoy Dey | 1074
Fujiyama Power Systems Commissions 1 GW Solar Cell Plant in Uttar Pradesh
Fujiyama Power Systems (UTL Solar) has announced the planned commissioning of a 1 GW Mono PERC solar cell manufacturing plant at Dadri, Uttar Pradesh, with an investment of around INR 300 crore.
Fujiyama Power Systems | January 22, 2026 | By Mrinmoy Dey | 1390
ALMM Update: 14,670 MW of Capacity Added, Total Capacity Increases to 88,905 MW
The Ministry of New and Renewable Energy (MNRE) has updated the ALMM List-I, adding 14,670 MW of solar module capacity and raising the total enlisted capacity to 88,905 MW.
Fujiyama Power Systems | April 22, 2025 | By Mrinmoy Dey | 2055
UTL Solar Files DRHP with SEBI to Raise Funds via IPO
Greater-Noida-based Fujiyama Power Systems (UTL Solar) has filed its DRHP with SEBI for an IPO comprising a fresh issue of INR 700 crore and an OFS of 2 crore shares, aimed at funding new manufacturing facilities, debt repayment, and corporate purposes.
Fujiyama Power Systems | January 01, 2025 | By Mrinmoy Dey | 3743
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
