TAG: "captive solar projects in Gujarat"
News
EUROBOND Commissions 2.2 MW Captive Solar Plant in Surat, Takes Total Capacity to 3.6 MW
EUROBOND has commissioned a 2.2 MW grid-connected captive solar plant in Surat, increasing its total solar capacity to 3.6 MW and enabling it to meet 50 percent of its factory's power requirements through renewable energy.
Captive Solar Projects In Gujarat | July 28, 2026 | By Mrinmoy Dey | 371
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
