TAG: "Captive RE project"

News

Powering Industry’s Renewables Shift: Open Access and Storage Reshape C&I RE Procurement

As renewable adoption scales in the C&I sector, procurement models are evolving – open access is gaining ground, rooftop solar remains relevant for smaller loads, and BESS is emerging as key to managing variability, reducing costs, and improving reliability. Energetica India talks to RE developers to decode the shift in RE procurement strategies.

Captive RE Project | May 07, 2026 | By Mrinmoy Dey 696

DERC Proposes Removing Voltage-Level Restriction for Green Energy Open Access Projects

The Delhi Electricity Regulatory Commission has proposed easing green energy open access norms by allowing consumers with a 100 kW or more load to procure renewable power irrespective of the connection voltage level.

Captive RE Project | April 17, 2026 | By Mrinmoy Dey 616

Articles

This category has no news at the moment.

Interviews

This category has no news at the moment.


 
 
Next events
 
 
Last interviews
 
Follow us