TAG: "Captive RE project"
News
Powering Industry’s Renewables Shift: Open Access and Storage Reshape C&I RE Procurement
As renewable adoption scales in the C&I sector, procurement models are evolving – open access is gaining ground, rooftop solar remains relevant for smaller loads, and BESS is emerging as key to managing variability, reducing costs, and improving reliability. Energetica India talks to RE developers to decode the shift in RE procurement strategies.
Captive RE Project | May 07, 2026 | By Mrinmoy Dey | 696
DERC Proposes Removing Voltage-Level Restriction for Green Energy Open Access Projects
The Delhi Electricity Regulatory Commission has proposed easing green energy open access norms by allowing consumers with a 100 kW or more load to procure renewable power irrespective of the connection voltage level.
Captive RE Project | April 17, 2026 | By Mrinmoy Dey | 616
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
