TAG: "captive hybrid plant in Gujarat"

News

Adani Green Energy to Supply 20.8 MW Wind-Solar Hybrid Power to Asahi India Glass

Adani Green Energy has announced a captive arrangement to supply 20.8 MW of wind-solar hybrid power to Asahi India Glass from its 25 MW solar and 20.8 MW wind power plant, both located at Khavda, Gujarat.

Captive Hybrid Plant In Gujarat | January 08, 2026 | By Mrinmoy Dey 676

Gujarat Alkalies and Chemicals to Procure 62.7 MW Hybrid Power from Aditya Birla Renewables

Gujarat Alkalies and Chemicals Ltd. (GACL) will procure 62.7 MW of renewable hybrid power from Aditya Birla Renewables through a captive arrangement, acquiring a 26 percent stake in the SPV, Aditya Birla Renewables SPV 4.

Captive Hybrid Plant In Gujarat | December 31, 2024 | By Mrinmoy Dey 1853

Articles

This category has no news at the moment.

Interviews

This category has no news at the moment.


 
 
Next events
 
 
Last interviews
 
Follow us