TAG: "captive hybrid plant in Gujarat"
News
Adani Green Energy to Supply 20.8 MW Wind-Solar Hybrid Power to Asahi India Glass
Adani Green Energy has announced a captive arrangement to supply 20.8 MW of wind-solar hybrid power to Asahi India Glass from its 25 MW solar and 20.8 MW wind power plant, both located at Khavda, Gujarat.
Captive Hybrid Plant In Gujarat | January 08, 2026 | By Mrinmoy Dey | 676
Gujarat Alkalies and Chemicals to Procure 62.7 MW Hybrid Power from Aditya Birla Renewables
Gujarat Alkalies and Chemicals Ltd. (GACL) will procure 62.7 MW of renewable hybrid power from Aditya Birla Renewables through a captive arrangement, acquiring a 26 percent stake in the SPV, Aditya Birla Renewables SPV 4.
Captive Hybrid Plant In Gujarat | December 31, 2024 | By Mrinmoy Dey | 1853
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
