TAG: "Captive Coal Based Power Plants"

News

MoP Orders Coal-based Captive Power Plants Above 50 MW to Maximise Output, Sell Surplus

The Ministry of Power has directed 112 captive coal-based generating stations with installed capacity of 50 MW and above to operate at the maximum available capacity from October 1 to December 31, 2026, and offer surplus power through power exchanges, amid expectations of rising electricity demand in the coming months.

Captive Coal Based Power Plants | September 28, 2026 | By Mrinmoy Dey |  624

Articles

This category has no news at the moment.

Interviews

This category has no news at the moment.


 
 
Next events
 
 
Last interviews
 
Follow us