TAG: "BESS project in Gujarat"
News
IndiGrid Commissions 180 MW/360 MWh Standalone BESS Project in Gujarat
IndiGrid has announced the commissioning of a 180 MW/360 MWh Battery Energy Storage System project in Gujarat, jointly developed with EnerGrid and backed by Gujarat Urja Vikas Nigam as the off-taker.
BESS Project In Gujarat | May 08, 2026 | By Mrinmoy Dey | 462
IFC and IndiGrid Partner to Develop 180 MW/360 MWh Standalone BESS Project in Gujarat
IFC has partnered with IndiGrid to support a 180 MW/360 MWh battery energy storage project in Gujarat. IFC committed INR 4.6 billion in long-term financing to IndiGrid through a subscription to listed non-convertible debentures.
BESS Project In Gujarat | July 04, 2025 | By Mrinmoy Dey | 1594
Gensol Engineering Wins GUVNL Bid to Develop 250 MW BESS in Gujarat
Gensol Engineering has secured the bid in Gujarat Urja Vikas Nigam’s (GUVNL) auction to develop pilot projects for 250 MW/500 MWh standalone battery energy storage systems (BESS) in Gujarat, as part of Phase III of tariff-based global competitive bidding.
BESS Project In Gujarat | June 12, 2024 | By News Bureau | 2512
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.
