Energetica India Magazine
As BESS deployment accelerates, can India build a globally competitive manufacturing ecosystem while meeting its growing storage demand? Energetica India speaks with industry leaders to get a BESS market pulse on domestic demand, market readiness, policy support needed and localisation strategies. From Imports to Integration: Is India Ready to Manufacture BESS at Scale? I ndia’s renewable energy capacity has reached 288.58 GW as of June 30, 2026. Solar (162.15 GW) and Wind (57.44 GW) contribute 219.59 GW – approximately 76 percent of the total installed RE capacity. Integrating such a large share of variable energy necessitated rapid deployment of energy stor- age systems. To support this, as of H1 2026, 8.7 GWh of battery ener- gy storage systems (BESS) have been installed, of which 7.1 GWh of capacity have been added in H1 itself, according to a report by India Energy Storage Alliance (IESA). Further, about 53 GWh of BESS projects are under execution. energetica INDIA- Jul-Aug_2026 46
Made with FlippingBook
RkJQdWJsaXNoZXIy OTAxNDYw