Our Company |   Join Our Club |      

news categories



news per location



October 2017



Read our bloggers



Power Plants



  • Directorio de Eficiencia energética

Tender for Design, Construction & Commissioning 2X100 MW (AC) Solar PV Power Plant for CIL

Jump to the comments

Tender for Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 2X100 MW (AC) Solar PV Power Plant for Coal India Limited (CIL) with Indigenous Cells & Modules including 10 Years Plant O&M at Neemuch-Mandsaur Solar Park, Madhya Pradesh under Domestic Competitive bidding.

Tender documents (Tender No. SECI/C&P/CIL/MP/082017/13 dated 04.10.2017) for Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 2X100 MW (AC) Solar PV Power Plant for Coal India Limited (CIL) with Indigenous Cells & Modules including 10 Years Plant O&M at Neemuch-Mandsaur Solar Park, Madhya Pradesh under Domestic Competitive bidding have been uploaded on www.tcil-india-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser).

NIT for the above said Tender has already been uploaded in leading newspapers of India with Reference No SECI/C&P/CIL/MP/082017/13 dated 10.08.2017

Interested bidders have to download the official copy of Tender documents after logging into the TCIL website by using the Login ID and Password provided by TCIL during registration. The bidder shall only be eligible to submit/ upload the Response to tender after logging into the TCIL portal and downloading the official copy. Bidders are requested to follow the instructions mentioned in the attached ETS guide to change the settings on Internet Explorer browser.

Tender Search Code (TSC) for the Tender: SECI-2017-TN0000012

For more detials refer to the attached PDF document.

Solar PV | News published on 08 / 11 / 2017 by Rashmi Nargundkar

Comments in this news Add yours

There are no comments. Add your comment

  Other Interesting News

Prysmian to further boost submarine project execution capabilities TI’s new “Wolverine” microcontroller platform slashes power by 50% vs other microcontrollers Gamesa Wins 40 MW Wind Power Project From Renew Power in India CG to supply power transformers and switchgear to Odessa Oblenergo, Ukraine MNRE sets a target of capacity addition of 29,800 MW during 12th Plan period