Our Company |   Join Our Club |      

news categories



news per location



May 2017



Read our bloggers



Power Plants



  • Directorio de Eficiencia energética

Suzlon wins 50.40 MW repeat order from a leading power utility.

Jump to the comments

Suzlon Group, one of the leading global renewable energy solutions provider in the world, today announced its repeat order win of 50.40 MW from a leading power utility. The project consists of 24 units of S97 120m hybrid tower with a rated capacity of 2.1 MW. Located in Kutch, Gujarat, the project will be completed by March 2017.

 

Suzlon will execute the entire project on a turnkey basis and will also provide operation and maintenance services for an initial period of 14 years through an integrated service package. The project has the potential to provide power to over 27,000 households and reduce 0.10 million tonnes of CO2 emissions per annum.

 

J.P. Chalasani, Group CEO, Suzlon Group said, “We are pleased to partner this leading power utility yet again in meeting their commitments of providing sustainable and affordable energy. India is witnessing a paradigm shift in the renewable energy landscape and it is heartening to witness power generation utilities embracing alternative energy to build up a robust sustainable energy architecture.

 

We are best equipped to pursue our efforts in bringing down the cost of energy with our comprehensive product portfolio, robust in-house R&D and more than two decades of experience in providing end-to- end solutions to customers along with a dedicated Life Cycle Asset management service capability.”

 

The S97 series of 2.1 MW WTG feature the time tested Doubly Fed Induction Generator (DFIG) technology which is designed to maximise generation at lower wind sites. It not only delivers higher energy output, but also offers higher return on investment for our customers.

 

At a height of 120 meters the S97-120m is the Worlds’ tallest All-Steel Hybrid tower which combines both lattice and tubular structures, designed indigenously to harness the enhanced availability of wind resources at higher altitudes making low wind sites viable. The combination of lattice and tubular gives enhanced tower strength at lower cost. The three-dimensional lattice structure can support heavier weights due to the broad base and reduces the steel requirement apart from being logistic friendly. The prototype, set up in November 2014, at Kutch, Gujarat, achieved a PLF of 35%.

 
Wind Power | News published on 23 / 01 / 2017 by Rashmi Nargundkar

Comments in this news Add yours

There are no comments. Add your comment

  Other Interesting News

Global Solar Photovoltaic Inverter Market Value will lose $500 Million by 2020 700 exhibitors from 33 countries at bC India Mongolia’s Vast Renewable Energy Resources Can Power Sustainable Development China Will Overtake US as World’s Leading Wind Power Producer by 2016 centrotherm photovoltaics’ centaurus technology for high efficiency solar cells