SECI - Extension for -NIT for and behalf of BDL for 5 MW(AC) Solar PV Power Plant at BDL Bhanur

Solar Energy Corporation of India Limited (SECI) on behalf of Bharat Dynamics Limited (BDL), The Employer, invites online bids from eligible bidders on Single stage – Two envelop bid system in the prescribed forms and formats, for setting up of 5 MW (AC) Solar Photovoltaic Power Plant at BDL, Bhanur, District Medak in the state of Telangana (India), on turnkey basis and thereafter comprehensive Operation & Maintenance for 5 years of the Plant, as per the Scope of Work mentioned hereinafter. A qualified bidder needs to set up the total capacity of 5 MW (AC) Power Plant at the designated location. The last date of bid submission has been extended to 17:00 hrs, 29th August, 2016. Prospective bidders are requested to refer to TCIL website for details.

Solar PV | News published on 19/08/2016 by Rashmi Nargundkar

Next events


Last interview
 Energetica India is a publication from Editorial Omnimedia. No reproduction in whole or part of content posted on this website.