Our Company |   Join Our Club |      

news categories



news per location



November-December 2016



Read our bloggers



Power Plants



  • Directorio de Eficiencia energética

Phoenix Solar implemented rooftop power plant in Slovenia

Jump to the comments
Phoenix Solar AG, a leading international photovoltaic system integrator listed in Prime Standard of the Frankfurt Stock Exchange, has realised a rooftop power plant with a peak output of 800 kilowatt in Naklo, Slovenia. The solar power plant was built by Phoenix Solar in cooperation with Gorenjske elektrarne and completed and connected to the grid of the local electricity supplier in December 2011. It is currently one of the ten largest solar power plants in Slovenia.

"This is the second project in Slovenia which Phoenix Solar AG has successfully implemented in 2011. A growing number of Slovenian companies are recognising the potential that solar electricity can offer. They are willing to invest in renewable energies or to have their roofs used for the construction of photovoltaic plants. We are confident that more projects will be realised in Slovenia this year", stated Thomas Sanders, who heads up Phoenix Solar AG's European rooftop plant operations.

Gorenjske elektrarne is a subsidiary of Elektro Gorenjska, one of Slovenia's leading energy utilities. The company specialises in the development of power from renewable energies and already has a portfolio comprising a number of solar and hydropower plants. The Merkur Group, which provides high-end technical products and operates several research centres in Slovenia, is the owner of the roof area.

Phoenix Solar AG aims is to continue its good cooperation with Gorenjske elektrarne and the Merkur Group in 2012. Slovenia offers interesting remuneration for the operators of solar plants and systems. It is based on a feed-in tariff model similar to that of Germany and is a lucrative opportunity for investors to commit to the expansion of renewable energies. The feed-in tariff paid for this project is 30.4 euro cents per kilowatt hour, guaranteed for a period of 15 years.
Solar PV | News published on 26 / 01 / 2012 by Gisela Bühl

Comments in this news Add yours

XVCRcFk8

Hi! This is kind of off topic but I need some guidance from an eiahblssted blog. Is it difficult to set up your own blog? I'm not very techincal but I can figure things out pretty fast. I'm thinking about making my own but I'm not sure where to begin. Do you have any tips or suggestions? With thanks
Posted on 26 / 01 / 2012 | cHbqJxfPP81

  Other Interesting News

MAN Diesel & Turbo supplies power plant engines to Dhaka Trina Solar announces Fourth Quarter and Full Year 2014 Results Moventas expands UP-Tower Service with Mobile Service Units Siemens opens a new factory for gas-insulated medium-voltage switchgear in India Suzlon achieves 10,000 MW installed wind energy milestone in India.