Page 39

Energética India | September / October 2015

ENERGETICA INDIA SOLAR POWER Status of Grid Connected SPV Rooftop Projects Sanctioned Energetica India looks at the Status of Grid Connected SPV Rooftop Projects Sanctioned to States/Uts/SECI/PSUs and Other Government Agencies; as of 31st August 2015. STATUS OF GRID CONNECTED SPV ROOFTOP PROJECTS SANCTIONED TO STATES/UTS/SECI/PSUS AND OTHER GOVERNMENT AGENCIES AS ON 31.08.2015 Sl.No State/Uts Projects Sanctioned under MNRE Scheme to SNAs/State Deptts. (MWp) NCEF BY MNRE In Principle approval Total Sanctioned and approved in principle Total Achievments (MWp) 1 Andhra Pradesh 5.5 4 9.5 1.99 2 Bihar 0 0 0 0.00 3 Chhattisgarh 0 5 5 16.28 4 Chandigarh 6.06 2 10 18.06 5.30 5 Delhi 0 8 8 3.78 6 Gujarat 5.75 0 5.75 19.00 7 Goa 0 2 2 0.00 8 Jharkhand 0 0 0 0.00 9 J&K 0 0 0 1.00 10 Haryana 0 5 5 0.00 11 Himachal Pradesh 0 12 Kerala 1.28 5 6.28 0.10 13 Karnataka 0 0 0 0.15 14 Madhya Pradesh 5 0 5 0.00 15 Maharashtra 0 0 0 0.13 16 Manipur 0 17 Odisha 0 4 4 0.00 18 Punjab 5 0 5 7.52 19 Rajasthan 6 0 6 2.98 20 Tamil Nadu 6.74 5 300 311.74 4.52 21 Tripura 0 0 0 0.00 22 Telangana 0 4 4 5.78 23 Uttarakhand 5 2 7 3.41 24 Uttar Pradesh 2 5 7 0.05 25 West Bengal 2.38 3 5.38 0.50 Subtotal 50.71 54 310 414.71 72.48 26 Solar Energy Corporation of India 0 149.6 750 899.6 21.48 27 Ministry of Railways 0 52.5 0 52.5 0.00 28 Allocated to PSUs 0 59.541 0 59.541 4.796 Sub TotalA 101.42 369.641 1370 1841.061 171.25 energetica INDIA · SEP | OCT15 37


Energética India | September / October 2015
To see the actual publication please follow the link above